Our Most Popular Gardening Projects
Project Requirement
The client had an uneven lawn and the amount of soil was overflowing above the patio. They needed the lawn and their patio at one level. The area also had low sunlight and was susceptible to weed growth.
Challenges
- 5 tonnes of excess soil was to be removed without disturbing the residents.
- Terraced house with carpeting so the soil had to be transported carefully outside.
- Invasive weed.
How did Essex Construction and Builders overcome the challenge?
- We excavated the excess soil manually and transported it carefully outside within one day.
- We levelled the soil to stay just a couple of inches below the patio level so that when the turf rolls were installed it would be flush with the patio.